Dec 30, 2005 PROJECT TITLE:
PNG GAS PIPELINE SURVEY |
|
| |
|
| EOS Joint Venture, on behalf of ExxonMobil and APC, appointed EGS Survey Pty Ltd (EGS) to carry out a Pipeline Route Survey and Geotechnical Survey to confirm the viability of the PNG Gas Pipeline Route. The comprehensive geotechnical survey undertaken by EGS included seabed sampling by gravity cores, 6m vibrocores, 5m rotary cores and CPT. CPT measurements included specialist T-Bar testing to resolve Shear Strengths of very soft sediments to an accuracy of +/-1kPa. For this 400km long
Pipeline project to supply gas to the Australian market passes from the
Omati River Mouth, PNG, to the Cape York Landfall near Weipa, EGS utilized
the vessel MV Samson explorer for survey operations. |
|
| |
|