Dec 30, 2005 PROJECT TITLE:
Shenzhen to Tai Po Twin Submarine Gas Pipelines Marine Survey and Monitoring |
|
| |
|
| Leighton Asia contracted EGS (Asia) Ltd to undertake a series of Hydrographic and Geophysical surveys throughout the installation process of twin 30km Submarine Pipelines linking Shenzen (Peoples Republic of China) and Tai Po (Hong Kong). Surveys were performed
at the following key stages of installation: Pre-commencement, post-dredging,
post-installation, post-back-filling and verification. Various survey
methods were utilized including Side Scan Sonar, Sub-Bottom Profiling,
Magnetometer and Multibeam Swath Bathymetry. |
|